Unger Project – 8/21/14

The Trusses are set and the roof is sheeted! The Unger’s Roof is quite a interesting part of this house, with its many angles and interesting pikes. There was quite a bit of work involved in this roof, taking the framers several days to complete. Getting a home...
Unger Project – July 29

Unger Project – July 29

Hey guys, we are excited to announce that the framing has started!  In this house, like most houses that we design, we are using 2x6spf exterior walls. There are two different wall heights; the dining room and great room are both 12′ tall walls, with the...
Unger Project – July 13, 2014

Unger Project – July 13, 2014

The floor system has been installed!  This home has a TGI floor joist system, which is an engineered floor system.  These joist are typically called I-joist, because they are shaped like a capital I.  These floor joist were invented in 1969, they have been designed to...
The Unger Project – June 24, 2014

The Unger Project – June 24, 2014

The foundation walls were set today (see the video in the link below). We design many homes with precast walls. These walls work perfect for many applications and meet today’s stringent energy codes.  The XI walls that are used on this house have foam insulation with...

Pin It on Pinterest