Unger’s Project – 3/3/15

Unger’s Project – 3/3/15

   There is a lot of detail going into the finishing touches of the Unger’s home, from the many layers of custom trim and paint to the hardwood flooring.  In the entrance way you will find several layers of crown molding, a tray ceiling, large columns, and wide...
Virtual Tour – 3/1/15

Virtual Tour – 3/1/15

Many of our customers have trouble visualizing their new home/addition on line based drawings.  We have been doing virtual tours, 3D drawings and 360* photo’s in rooms for our customers for over a year now.  See some of the attached photo’s that we did for...
Unger Project – 11/17/14

Unger Project – 11/17/14

  This week the brick install has begun.  The Unger’s exterior veneer is a combination of a brick and stone veneer.  As you can see on the drawings (on the Feb. 15 entry)  There are many options when it comes to an exterior veneers.  Here at Eby’s Drafting...
Unger Project – 11/3/14

Unger Project – 11/3/14

This week the garage doors were installed –  The Unger’s garage will be completely finished with trim and paint, so these doors are insulated (R.17)  Carriage House doors, by C.H.I Overhead Doors.  These doors are formed from 27-gauge steel, inside and...